|
Collection of free download engineering and science ebooks Wed, 27 Aug 2008 17:46:04 +0200 File : pdf, 1.43 MB, 116 pages
TOC
CHAPTER 1.DEFINITIONS AND RESPONSIBILITIES
Section 1.Air Compressor Plant
1 Components Of An Air Compressor Plant
2 Air Compressor
3 Auxiliary Equipment
4 Controls
5 Cooling Water Treatment
Section 2.Operation And Maintenance Responsibilities
1 Operation
2 Disaster Control
3 Operator Maintenance
4 Preventive Maintenance
5 Breakdown Maintenance
6 Compressed Air System Leaks
CHAPTER 2.POSITIVE DISPLACEMENT COMPRESSORS
Section 1.Reciprocating Compressors
1 Description
2 Safety Precautions
3 Startup
4 Normal Operation
5 [...]
Tue, 26 Aug 2008 18:10:39 +0200 File : pdf, 684 KB, 54 pages
TOC
1.0 INTRODUCTION
2.0 PESTICIDES (WOOD PRESERVATIVES)
3.0 WOOD POLE INSPECTION AND MAINTENANCE
3.1 Introduction
3.2 Visual Decay Detection
3.3 Inspection & Maintenance Procedures for Wood Poles
3.3.1 Internal Decay
3.3.2 External Surface Decay
3.3.3 Insects
3.3.4 Inspection Procedures
4.0 REMEDIAL TREATMENTS
4.1 Superficial Preservative Treatments
4.2 Groundline or Bandage Treatment
4.3 Internal Void Treatment
4.4 Fumigant Treatment
5.0 POLE TOP PROTECTION
6.0 POLE STRENGTH RESTORATION
7.0 [...]
Mon, 25 Aug 2008 06:56:03 +0200 File : pdf presentation, 1.7 MB, 19 pages
Contents
Definitions for Scuffing
Characteristics of Scuffing
Historical Attempts to Define Critical Scuffing Criteria
Some Problems with Critical Scuffing Criteria based solely on Mechanics
Current Scuffing Tests Popularly Use Stepped Loading to Determine Critical Loads
Some ASTM Standards Used to Quantify Scuffing-Related Performance of Oils
ORNL’s Approach to Scuffing Measurement Case Study : Fuel Injector [...]
Mon, 18 Aug 2008 07:41:12 +0200 File : pdf, 7.3 MB, 118 pages
TOC
WORKSHOP SUMMARY
Purpose
WORKSHOP AGENDA
PRESENTATIONS
Introductory Presentations
Workshop Presentations
DISCUSSION
CONCLUSIONS
ATTENDANCE LIST
Industry
Academia
PRESENTATION SLIDES
NIST Ceramic Coatings Program
Process Diagnostics
- Diagnostic and Control Sensors for Spray Systems
- Holography of droplets and particles
- Need for Diagnostics, Sensors and Modeling in Thermal Spray
- Diagnostics, Sensing, and Modeling for Plasma Spray
Spectroscopy Measurements
- EMISSION SPECTRA
Thermal Imaging
- Temperature Monitoring is Critical to Process [...]
Fri, 15 Aug 2008 17:04:48 +0200 File : pdf, 1.1 MB, 35 pages
TOC
1. INTRODUCTION
2. SCOPE AND OBJECTIVE
3. FUNCTIONAL REQUIREMENTS
4. TRAP CLASSIFICATION
5. OPERATIONAL CHARACTERISTICS
5.1 ORIFICE PLATE STEAM TRAPS
5.2 CONVENTIONAL TRAPS
6. USER EXPERIENCE
7. NEEDED INFORMATION
8. CONCLUSIONS
ACKNOWLEDGMENTS
REFERENCES
Figure
1 Steam supply and condensate drainage piping for a common space heater
2 Typical orifice plate steam trap installation
3 Configuration of a bellows steam trap
4 Configuration of a bimetallic [...]
Wed, 13 Aug 2008 04:21:52 +0200 File : pdf, 2.5 MB, 171 pages
TOC
1. Introduction
2. Regulatory Overview
2.1 Background
2.2 Overview of Methodology
2.3 General Performance Standards
2.4 Basic Statistical Methods and Sampling Procedures
3. Choosing a Sampling Interval
3.1 Example Calculations
3.2 Flow Through Karst and “Pseudo-Karst” Terranes
4. Choosing a Statistical Method
4.1 Flowcharts–Overview and Use
4.2 Checking Distributional Assumptions
4.3 Checking Equality,of Variance: Bartlett’s Test
5. Background Well to Compliance Well [...]
Sun, 10 Aug 2008 16:55:04 +0200 File : pdf, 2 MB, 173 pages
TOC
1. INTRODUCTION
1.1 SCOPE AND OBJECTIVES
1.2 APPROACH
2. INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS
2.1 TYPES OF ICI BOILERS
2.1.1 Firetube Boilers
2.1.2 Watertube Boilers
2.1.3 Other Combustion Boilers
2.2 FUEL FEED SYSTEMS
2.2.1 Stokers
2.2.2 Burners
2.3 EMISSION RATES
2.3.1 Uncontrolled Emissions
2.3.2 Controlled Emissions
3. FUELS, EMISSIONS, AND EFFICIENCY
3.1 FUELS
3.1.1 Coal
3.1.2 Fuel Oil
3.1.3 Natural Gas
3.1.4 Biomass
3.1.5 Refuse-Derived Fuel
3.1.6 Other Fuels
3.1.7 Mixed [...]
Wed, 06 Aug 2008 18:03:52 +0200 File : pdf, 9.17 MB, 132 pages
TOC
1. Overview of Minimum Technology Guidance and Regulations
for Hazardous Waste Landfills
Double Liners and Leachate Collection and Removal Systems
Leak Detection Systems
Closure and Final Cover
Construction Quality Assurance
Summary of Minimum Technology Requirements
2. Liner Design: Clay Liners
Introduction
Materials
Clay Liners versus Composite Liners
Darcy’s Law, Dispersion, and Diffusion
Laboratory Tests for Hydraulic Conductivity
Field Test versus Laboratory Tests
Attack [...]
Tue, 05 Aug 2008 19:01:28 +0200 File : pdf, 3.15 MB, 122 pages
TOC
Section 1: Pumping System Basics
Overview
Pumping System Components
Pumping System Principles
Section 2: Performance Improvement Opportunity Roadmap
Overview
The Fact Sheets
Assessing Pumping System Needs
Common Pumping System Problems
Indications of Oversized Pumps
Piping Conigurations to Improve Pumping System Eficiency
Basic Pump Maintenance
Centrifugal Pumps
Positive Displacement Pump Applications
Multiple Pump Arrangements
Pony Pumps
Impeller Trimming
Controlling Pumps with Adjustable Speed Drives
Section 3: The Economics [...]
Tue, 05 Aug 2008 00:48:19 +0200 File : pdf, 5.9 MB, 125 pages
TOC
1—Introduction
Background
Approach
2—UXO Characteristics
Classifications
Depth of Penetration
3—Geophysical Sensors for Detecting UXO
Magnetometry
Electromagnetic Induction
Maximum Detection Depth
4—Target Influence on Sensor Response
Burial Depth
Target Size
Surrounding Environment
Target Condition
Target Orientation
Target Composition
5—Site Variability and Its Influence on UXO Detection
Geologic Anomaly
Natural Geologic Background
6—UXO Detection Planning
Importance of Phenomenology
How geologic environments influence site characteristics
Geophysical parameters relevant to UXO detection
Noise
Phenomenological Evaluation
Task 1: Geo-environmental information
Task [...]
Sun, 03 Aug 2008 00:42:55 +0200 File : pdf, 891 KB, 80 pages
TOC
Chapt 1 Introduction
1.1. Scope
1.2. References
Chapt 2 Purpose of Sealing
2.1.Purpose
2.2.Reduce Maintenance Costs
Chapt 3 When to Seal
3.1.Field Evaluation
3.2.Schedule
3.3.Climate Conditions
3.4.Porous Friction Surfaces
Chapt 4 Specifications
4.1.Federal and ASTM
4.2.Other
Chapt 5 Material Uses
5.1.Fed.Spec. and ASTM
5.2.DOT Spec
5.3.Other
Chapt 6 Crack Preparation Equipment
6.1.Introduction
6.2.Equipment Inspection
6.3.Equipment
Chapt 7 Crack Preparation Procedures
7.1.Crack Size Guidelines
7.2.Crack Widening
7.3.Initial Crack Cleaning
7.4.Debris Removal
7.5.Final Crack Cleaning
7.6.Inspection
Chapt 8 Crack Sealing [...]
Wed, 30 Jul 2008 18:21:12 +0200 File : pdf, 2.98 MB, 207 pages
TOC
1. INTRODUCTION
1.1 SCOPE AND OBJECTIVES
1.2 APPROACH
1.3 COGENERATION OPPORTUNITIES
1.4 RERENCES
2. COGENERATION TECHNOLOGY ISSUES
2.1 TECHNOLOGY DESCRIPTION
2.2 NATIONAL ENERGY ACTS
2.3 ENVIRONMENTAL REGULATIONS
2.3.1 Clean Air Act
2.3.2 Clean Water Act
2.4 BENEFITS AND BARRIERS
3. PRIME MOVERS
3.1 STEAM TURBINES
3.1.1 Description
3.1.2 Design and Performance Characteristics
3.1.2.1 Efficiency
3.1.2.2 Capital cost
3.1.2.3 Availability
3.1.2.4 Maintenance
3.1.2.5 Heat recovery
3.1.2.6 Fuels and emissions
3.1.3 Potential Applications
3.2 [...]
Mon, 28 Jul 2008 19:21:51 +0200 File : pdf, 1.2 MB, 92 pages
TOC
Section 1: Introduction to Fan Systems
Fans
Fan Performance Curves
Fan System Components
Section 2: Performance Improvement Opportunity Roadmap
1 Assessing Fan System Needs
2 Fan Types
3 Basic Maintenance
4 Common Fan Systems Problems
5 Indications of Oversized Fans
6 System Leaks
7 Configurations to Improve Fan System Efficiency
8 Controlling Fans with Variable Loads
9 Fan Drive Options
10 Multiple-Fan Arrangements
11 [...]
Fri, 25 Jul 2008 18:21:27 +0200 File : pdf, 3.08 MB, 149 pages
CONTENT
Introduction
Methods of Achieving Objectives
Scope and Purpose of the National Electrical Code
This Guide
Longevity, Materials, and Safety
Testing and Approval
Photovoltaic Modules Module Marking
WIRING
Module Interconnections
Tracking Modules
Terminals Transition Wiring
Module Connectors
Module Connection Access
Splices
Conductor Color Codes
PV Array Ground-Fault Protection
PV Array Installation and service
Grounding Definitions GroundingóSystem
Size of DC Grounding Electrode Conductor
Point of Connection
Unusual Grounding Situations
Charge Controllers System [...]
Wed, 23 Jul 2008 16:15:52 +0200 File : pdf, 226 KB, 67 pages
TOC
CHAPT 1 INTRODUCTION
CHAPT 2 INSPECTOR QUALIFICATIONS, CERTIFICATIONS AND LICENSES
CHAPT 3 INSPECTION AND TEST FREQUENCIES
3-1 BOILERS 3-2 UNFIRED PRESSURE VESSELS
CHAPT 4 BOILER INSPECTIONS
4-1 GUIDANCE
4-2 EXTERNAL INSPECTION OF BOILERS
4-3 INTERNAL INSPECTION OF BOILERS
4-4 BOILERS IN WET OR DRY LAY-UP
CHAPT 5 UNFIRED PRESSURE VESSEL INSPECTIONS
5-1 GUIDANCE
5-2 EXTERNAL INSPECTIONS OF UNFIRED PRESSURE VESSELS
5-3 [...]
Mon, 21 Jul 2008 02:52:16 +0200 File : pdf, 4.4 MB, 187 pages
TOC
CHAPT 1 – INTRODUCTION
1.1 PURPOSE
1.2 BACKGROUND
1.3 DOCUMENT ORGANIZATION
1.4 DUAL SYSTEM OF UNITS
CHAPT 2 – DEBRIS CHARACTERIZATION
2.1 DEBRIS CLASSIFICATION
2.1.1 Types of Debris
2.2 FLOW BEHAVIOR OF FLOATING DEBRIS
2.2.1 Debris Transport and Transport Mechanisms
2.2.2 Debris Jams and Debris Dams
2.2.3 Debris Accumulation
2.3 PROBLEMS ASSOCIATED WITH DEBRIS
CHAPT 3 – ESTIMATING DEBRIS QUANTITIES
3.1 INTRODUCTION
3.2 DEBRIS [...]
Sat, 19 Jul 2008 01:27:42 +0200 File : pdf, 2.6 MB, 58 pages
TOC
CHAPT 1. INTRODUCTION.
1. General
1.1 Purpose
1.2 Scope
1.3 Frequency Requirements
1.4 Terminology
2. Factors to Consider.
2.1 Structural Properties of Wood .
2.1-A Species
2.1-B Quality
2.1-C Condition
2.2 Conditions of use
2.2-A How the Building is Used and Unusual Loading
2.2-B Age of the Building
2.2-C Exposure of Wood Element
2.3 Deterioration
2.3-A Biological
2.3-B Physical
2.3-C Chemical Damage
3. Condition Rating System
3.1 No Attention [...]
Thu, 17 Jul 2008 04:11:22 +0200 File : pdf, 3.86 MB, 173 pages
TOC
Part I lntroduction
Part II A Model Respiratory Protection Program for Asbestos Abatement Operations
A. Written Statement of Company Policy
B. Written Standard Operating Procedures
C. Respirator Selection
(1) Respiratory Protection Against Asbestos
(2) Respiratory Protection for Non-Abatement Operations
D. Medical Examinations
E. Worker and Supervisor Training
(1) Worker Training
(2) Supervisor Training
F. Respirator Fit Test
(1) Quantitative Fit test
(2) [...]
Tue, 15 Jul 2008 03:29:11 +0200 File : pdf, 832 KB, 115 pages
TOC
Chapt 1 Introduction
Purpose
Applicability
References
Related H&H Guidance
Chapt 2 Reservoir Purposes
Congressional Authorizations
Reservoir Purposes
Flood Control
Navigation
Hydroelectric Power
Irrigation
Municipal and Industrial Water Supply
Water Quality
Fish and Wildlife
Water Management Goals and Objectives
Chapter 3 Multiple-Purpose Reservoirs
Hydrologic Studies for Multipurpose Projects
Relative Priorities of Project Functions
Managing Competitive and Complementary Functions
Operating Concepts
Construction and Physical Operation
General Study Procedure
Chapt 4 Reservoir Systems
Introduction
System Description
Operating Objectives [...]
Sun, 13 Jul 2008 00:53:49 +0200 File : pdf, 961 KB, 156 pages
TOC
CHAPTER 1. INTRODUCTION
Purpose
Scope
References
CHAPTER 2. FACILITY POWER SYSTEM
Dependable power system requirements
Commercial (utility) power
Power line phenomena
Power quality requirements
Power quality parameters
Detection of power line anomalies
CHAPTER 3. POWER CONDITIONING
Information technology equipment power requirements
Power line disturbances
Acceptable limits for ac power
IT protective equipment
Power distribution systems
CHAPTER 4. GROUNDING
Purpose of grounding
National electrical code (NEC) requirements [...]
|